Video 1 Production Blueprint
Three-Act Build Story: From Arrival to Final Readiness
This shoot blueprint defines the narrative structure for Video 1, a 60-second cinematic build documentary spanning three production visits. Each act serves a distinct storytelling purpose: establishing scale and arrival energy, showcasing the engineering intensity of the build process, and delivering a powerful final reveal of complete readiness. Every shot captured across all three visits must map directly to one of these three acts to ensure tight narrative cohesion and maximum visual impact.
Act 1: Arrival + Scale
0–10 seconds
Vehicles arriving, equipment unloading, "big pumps" reveal. Establish this is a serious, large-scale professional build operation.
Act 2: Work + Engineering
10–40 seconds
Rigging assembly, water system construction (towers, lines, fittings), CO₂ infrastructure, stage SFX placement, control prep and communications coordination.
Act 3: Final Readiness Reveal
40–60 seconds
Towers aligned, stage fully loaded, systems checked and locked. One powerful "ready" moment. End tag: "Ready for 3:00am" or "FireOne SFX Package."

Editing Rule: Every single shot captured across all three visits must clearly fit into one of these three narrative acts. No exceptions. This structure is locked.
Three-Visit Production Strategy Overview
The complete Video 1 story unfolds across three strategically timed production visits, each designed to capture a specific phase of the build progression. This phased approach ensures comprehensive coverage of the entire setup timeline while providing clear visual escalation from initial arrival through final readiness. A single-person camera and drone unit handles Visit 1, establishing the foundation for subsequent visits to build upon.
1
Visit 1: Wednesday — Beginning Setup
1-Person Unit (Camera + Drone)
Primary goal: capture the start of the build and establish scale through arrival footage, early installs, and "systems coming to life" moments. Deliverables include Act 1 foundation plus early Act 2 build sequences.
2
Visit 2: Mid-Build Progress
Date/Time TBD
Primary goal: showcase visible escalation with towers rising, advanced rigging work, increased equipment presence, and intensified crew activity. Deliverables include core Act 2 "engineering montage" sequences showing serious build progression.
3
Visit 3: Near-Finish / Final Setup
Close to Event Start
Primary goal: capture the "final readiness reveal" with last-minute checks, towers positioned, stage fully loaded, and control systems ready. Deliverables include Act 3 reveal sequences plus strongest hero shots capturing pre-show atmosphere.
Visit 1 — Wednesday
Visit 1 Detailed Shot List: Establishing Scale and Early Build
Wednesday's single-person unit focuses on capturing critical establishing shots and initial build energy. This visit lays the visual foundation for the entire video, requiring precise attention to location context, arrival dynamics, and early engineering work. Success depends on securing both aerial perspective and ground-level intimacy to establish the scale and professionalism of the operation.
A) Establishing + Location Context
Drone + Camera Coverage
  • High altitude wide establishing of venue/stage footprint
  • Lower pass over staging and rigging zones
  • Ground-level wide of crew arriving and work area
B) Arrival / Unloading / Scale
Act 1 Foundation Shots
  • Vehicle pulls in, doors open, team steps out
  • Equipment cases and pumps brought down ramps
  • Hands moving gear with purposeful energy
Capture Sequence Approach
01
Drone wide establishing: 10–15 seconds of clean, stable footage showing full venue context
02
Ground wide: trucks and vehicles arriving (if arrival timing aligns with shoot window)
03
Detail shots: gear being opened, unloaded, and staged — focus on "big pumps" and hero equipment
Visit 1: Arrival and Unloading Coverage Requirements
Act 1 shots establish the arrival energy and professional scale of the operation. These sequences must capture the transition from transport to active build site, emphasizing both team coordination and the substantial equipment being deployed. Hero object focus is critical: "big pumps" and major system components must be visually identifiable and impressive throughout this coverage.
Must Capture Actions
  • Vehicle pulls in, doors open, team members step out with purpose
  • Equipment cases, pumps, hoses, and rigging brought down ramps
  • Hands moving gear rapidly showing active work energy and urgency
Coverage Requirements
  • Wide: vehicle + crew + surrounding space in single frame
  • Medium: team carrying pumps, hoses, and rigging equipment
  • Tight: hands on straps, latches, clamps, bolts — detail work
Early Build / Engineering Montage
Act 2 Early Foundation
Must capture systems being actively built and assembled:
  • Water system components staged and assembled on-site
  • Hoses and lines being connected with precision
  • Rigging frames or tower assembly beginning
  • CO₂ components positioned and connected (clean angles only)
  • Stage effects prep beginning (if visible and permitted)

Hero Object Priority: Big pumps and major components must be visually identifiable and impressive. These objects carry the visual weight of professionalism and scale.
Visit 1: Engineering Montage Shot Types
Act 2 early coverage requires a methodical approach to capturing the technical precision and complexity of system assembly. These shots form the backbone of the engineering montage, demonstrating the skill, coordination, and attention to detail required for professional SFX installation. Each shot type serves a specific narrative purpose in building audience understanding and appreciation of the build complexity.
Tight Detail Shots
Minimum Shot Requirements
  • Fitting connections being secured
  • Tightening clamps and fasteners
  • Cable ties and precision attachments
  • Hands performing technical assembly work
Hold each shot 6–10 seconds for editing flexibility
Medium Action Shots
Crew Coordination Focus
  • Crew members coordinating installs
  • Two-person lift and positioning work
  • Communication and teamwork moments
  • Equipment being moved into place
Capture both "clean" and "busy" energy variations
Wide Progress Shots
Scale and Context
  • Overall build progress visible in frame
  • Multiple work areas showing simultaneous activity
  • Scale of operation and equipment deployment
  • Spatial relationships between systems
These establish visual progression between visits
Visit 1: Control Systems and Coordination Coverage
If Sachin or control setup is active during Wednesday's visit, capture brief but powerful inserts demonstrating the command and coordination infrastructure. These shots add technical credibility and show the sophistication behind the SFX execution, but must remain short and focused — designed as 0.5 to 1.0 second inserts in the final edit rather than extended sequences.
Control / Coordination Shots (Act 2 Credibility Inserts)
  • Hands on control boards or control devices (non-sensitive angles only)
  • Radio and communications checks showing coordination
  • Planning boards or layout diagrams (only if approved by FireOne)

Critical Note: Keep these shots short and powerful — designed as quick inserts (0.5–1.0 seconds) in final edit, not extended sequences.
End of Visit Checkpoint Shot
Before leaving Wednesday, capture one strong "progress state" establishing shot showing what's completed so far. This becomes your critical "before" reference point for Visit 3's "after" reveal comparison.
Visit 1 Success Criteria
  • Clean Act 1 sequence can be assembled from Wednesday footage alone
  • Sufficient "engineering montage" shots exist to start building Act 2
  • At least 3–5 strong, usable drone clips captured
  • "Before" checkpoint shot secured for later comparison
Visit 2 — Mid-Build
Visit 2 Detailed Shot List: Showcasing Build Escalation
The mid-build visit's primary mission is demonstrating clear escalation: "this is getting serious." More towers erected, more complex rigging deployed, more crew members actively working, and increased overall build complexity must be immediately visible. This visit provides the core Act 2 engineering montage material that forms the heart of the video's narrative intensity.
A) Progress Establishers
Match Cut Strategy
Recreate 2–3 specific camera angles from Wednesday to enable dramatic "progress jump" editing:
  • Same wide ground angle of towers area
  • Same wide drone angle of stage footprint
  • Same "hero object" (pumps) now actively integrated into systems
B) Tower Progress (8 Towers System)
Must Capture:
  • Towers partially or mostly erected showing height and scale
  • Lines and nozzles installed and positioned
  • Crew adjusting alignment, spacing, and positioning
Minimum requirements: Wide (multiple towers in frame), Medium (tower work activity), Tight (nozzle detail, fittings, clamps, water line connections)
Visit 2: CO₂, Stage Effects, and Crew Action Coverage
Mid-build coverage must capture the increasing sophistication and intensity of the installation work. CO₂ systems, stage effects placement, and coordinated crew activity all demonstrate the build's progression toward completion. The "hard at work" montage material captured here establishes the professional tone and work ethic that defines the video's emotional impact.
C) CO₂ System Progress
Towers + Stage Integration
Must capture:
  • CO₂ systems positioned strategically across venue
  • Hook-ups and system checks being performed
  • Safety and handling visuals showing professionalism without revealing sensitive technical details
D) Stage Effects Progress
Pyro Top + Pyro Front + Stage CO₂
Must capture (if permitted):
  • Wide: stage with effects points visible
  • Medium: crew installing or checking placements
  • Tight inserts: safe angles showing "precision work" without compromising sensitive information
E) Crew "Hard at Work" Montage
Key for Video Tone
Capture purposeful action beats:
  • Two people lifting or positioning rigging together
  • Someone guiding alignment with precision
  • Someone checking lists or communicating via radio
  • Quick safety visuals: gloves, helmets, harnesses (if present)
Visit 2 Success Criteria
Act 2 becomes visually rich and clearly "engineering-driven" • Visible progress from Visit 1 is obvious and dramatic • Tower-wide "scale" shots exist that sell the cinematic build scope
Visit 3 — Final Setup
Visit 3 Detailed Shot List: The Final Readiness Reveal
Visit 3's primary mission is capturing the powerful "ready for showtime" reveal that concludes Video 1. This is the culmination of the entire build narrative — the moment when all systems are complete, checked, and locked for show execution. These shots must convey confidence, completion, and professional readiness with undeniable visual impact.
A) Final Readiness Establishers
Act 3 Foundation
  • Wide ground shot: full stage plus towers (as much in one frame as physically possible)
  • Drone establishing: clean aerial showing completed layout and crowd build (if happening)
B) Final Checks / "Last 10%" Work
Act 3 Action Sequences
  • Final tightening and final connections being secured
  • Final safety checks and system confirmations
  • Team communication and verbal confirmations
  • One clear, unmistakable "we are ready" moment
C) Hero Shots (Non-Negotiable)
  • 8 towers in one composition if possible (symmetry emphasized)
  • Control readiness: Sachin station ready (even if only a brief glimpse)
  • Stage loaded for show (pyro/CO₂ positions implied, not over-exposed)
D) "Final Reveal" Closing Shot Options
Choose 1–2 to close Video 1:
Option 1
Wide: completed setup plus stage atmosphere showing pre-show energy
Option 2
Drone pullback: completed venue footprint revealing full scale
Option 3
Tight: final switch, final handshake, or final "ready" nod (if natural and available)

Visit 3 Success Criteria: Strongest "after" shots clearly conclude the build narrative • Video 1 can close with a definitive visual "ready" statement
Shot Priorities: Time-Constrained Capture Strategy
When production time becomes constrained, prioritize shots using this three-tier system. Tier 1 shots are absolute must-haves that form the video's narrative spine. Tier 2 shots significantly strengthen the story but can be omitted if necessary. Tier 3 shots add polish and production value but are not critical to core narrative success.
1
2
3
1
Tier 1: Must Have
Non-negotiable shots — absolute minimum for story completion
2
Tier 2: Should Have
Important shots that strengthen story significantly
3
Tier 3: Nice to Have
Polish shots that add production value
Tier 1 (Must Have)
  • Vehicles unloading + pumps reveal (Act 1 foundation)
  • Tower build activity showing progress (Act 2 core)
  • Completed towers and setup reveal (Act 3 conclusion)
  • At least 3 drone clips across visits (scale proof)
Tier 2 (Should Have)
  • Control station inserts (Sachin and communications)
  • Stage effects placement progress documentation
  • Crew coordination moments showing teamwork
  • Match cut angles for progression comparison
Tier 3 (Nice to Have)
  • Time-lapse segments (if technically possible)
  • Signage, branding, or uniform details
  • Close texture shots for editorial transitions
  • Additional drone orbit or pullback moves
Coverage Method: Single-Person Unit Capture Rules
Practical capture methodology ensures efficient, high-quality footage collection with a single operator handling both camera and drone. The "micro sequence" approach guarantees comprehensive coverage of each activity while maintaining editorial flexibility. Consistency in shot duration and coverage style across all three visits ensures smooth editing workflow and cohesive final product quality.
Micro Sequence Approach
Capture in "micro sequences" of 3–5 shots per activity:
  1. Wide — establishes context and spatial relationships
  1. Medium — captures action and human activity
  1. Tight — reveals detail and technical precision
Hold each shot steady for at least 6–10 seconds to provide editing flexibility and options for pacing control.
Always Capture Both Variations
  • "Clean" footage: no interruptions, steady performance, ideal technical execution
  • "Busy" footage: energy visible, people moving with purpose, active work atmosphere
This dual approach provides editorial options for pacing and energy management throughout the final edit.
Drone Usage Rules
Priority: Stable, Readable Shots
Prioritize stable, readable aerial shots over aggressive or showy camera moves. Clean, controlled footage always trumps dynamic-but-shaky coverage.
Minimum Drone Capture Requirements
  1. 1 high altitude establish showing full venue context
  1. 1 mid-level reveal pass showing build zone detail
  1. 1 pullback or orbit (only if safe and explicitly permitted)
Safety and Permission First
All drone operations must comply with:
  • FireOne safety protocols and site restrictions
  • FAA regulations and local airspace rules
  • Venue-specific flight boundaries and no-fly zones
  • Active work zone safety — never interfere with build operations
On-Site Data Workflow: Enabling Early Video 1 Assembly
Efficient on-site data management enables Video 1 assembly to begin immediately after Visit 1, with progressive upgrades after subsequent visits. Proper file organization, naming conventions, and daily offload procedures ensure the editor can work on Act 1 while Visit 2 coverage is still being captured, significantly accelerating final delivery timeline.
Naming + Sorting for Fast Edit Workflow
Create clearly organized bins and folders per visit to enable immediate editorial access:
1
Visit 1 Organization
Arrival / Pumps / Towers / Control / Drone
2
Visit 2 Organization
Towers / CO₂ / Stage / Crew / Drone
3
Visit 3 Organization
Final Reveal / Checks / Control / Drone
Daily Process (Recommended)
After each visit, follow this workflow:
  • Offload and verify all footage — check for corruption or missing files
  • Highlight selects using star or color-coding system for quick identification
  • Assemble rough Act 1 / Act 2 / Act 3 skeleton structure

Editor Integration: If editor is involved even for Video 1: editor begins assembly immediately after Visit 1 footage is delivered, then upgrades edit after Visit 2, and finalizes after Visit 3 completion.
FireOne Coordination Requirements (For Video 1 Shoots)
  • Confirm setup schedule per day — what's being built when
  • Identify best filming zones — safe and non-interfering with work
  • Confirm if control station is available to film on any visits
  • Confirm if any sensitive SFX components should be filmed only in specific ways or angles
Deliverable Output Specifications for Video 1
Final Video 1 deliverables must meet specific technical specifications for optimal social media and presentation performance. The primary 9:16 vertical format targets mobile-first platforms, while optional 16:9 and teaser cutdowns extend usage flexibility across multiple distribution channels. All exports must maintain pristine technical quality and include approved branding elements.
Primary Master Export
  • Format: 9:16 vertical (mobile-optimized)
  • Duration: 45–60 seconds (target 60s if possible)
  • Resolution: 1080x1920 minimum (4K preferred if footage supports)
  • Codec: H.264 or H.265 for maximum compatibility
Captions and Text Overlays
  • Minimal, clean, professional typography
  • "Ready for showtime" statement or equivalent
  • FireOne branding placement (as approved by client)
  • Optional: subtle technical specifications or system details
Optional Secondary Exports
  • 16:9 version: horizontal format for presentation use (if needed)
  • Teaser cutdowns: 1–2 versions at 10–15 seconds each as social add-ons
  • Audio options: music-only, sfx-enhanced, or silent versions
Technical Quality Standards
Video Specifications
  • Color grading: cinematic, consistent across all shots
  • Transitions: clean cuts, no cheesy effects
  • Speed ramping: use strategically for emphasis
  • Text legibility: high contrast, readable on mobile
Audio Specifications
  • Music: licensed track, builds to climax at Act 3
  • SFX: subtle industrial sounds to enhance reality
  • Mixing: balanced levels, no audio clipping
  • Mastering: normalized for social media platforms
Key Decisions Needed Before Visit 1 Wednesday
These critical logistical decisions must be confirmed before the Wednesday Visit 1 shoot begins. Failure to secure clear answers on any of these points risks missing essential coverage, safety violations, or wasted shoot time. All parties — production team, FireOne coordinators, and venue management — must align on these specifics at least 24 hours before call time.
Wednesday Call Time and Setup Activities
Confirm exact call time and which specific setup activities will be happening during the Visit 1 window. Understanding the build schedule ensures camera is present for critical moments.
Vehicle Arrival and Unloading Timing
Confirm whether actual vehicles arrival and equipment unloading will occur Wednesday, or if these moments need to be staged. Act 1 depends entirely on capturing this arrival energy authentically.
Drone Launch Location and Flight Boundaries
Confirm where drone can safely launch from and establish clear, mapped flight boundaries. Identify any no-fly zones, restricted airspace, or venue-specific limitations that could impact aerial coverage.
On-Site Point of Contact
Confirm who the designated on-site point of contact is for access questions, safety coordination, and real-time filming permissions. Production must have a direct line to someone with authority to approve or deny specific shots.